Peloro Miami Beach a Luxury Condo located in the heart of Miami Beach, an boutique, intimate building whose curvalinear design of glass walls are perfectly married to the Regatta building just South of it.
Perfectly situated in mid beach on Indian Creek and the Bay, just minutes away from Bal Harbour and South Beach.
BUILDING SUMMARY:
Developer: SMG
Architect: Revuelta Vega Leon LP
Year Built: 2014
Total Units: 115
Stories: 7
Unit Sizes: 635 To 2268 ft2
Bedrooms: 1, 2 & 3
RESIDENCE
INTERIOR
TERRACE
TOTAL SQ.FT
FLOOR PLANS
01
652
280
932
download PDF
02
652
140
792
download PDF
03
652
133
785
download PDF
04
690
175
865
download PDF
05
1,225
175
1,400
download PDF
06
1,084
253
1,337
download PDF
07
1,182
236
1,418
download PDF
08
1,285
242
1,527
download PDF
09
1,230
228
1,458
download PDF
10
1,675
539
2,214
download PDF
11
1,675
362
2,037
download PDF
12
1,230
360
1,590
download PDF
13
1,230
360
1,590
download PDF
14
1,230
360
1,590
download PDF
15
1,230
360
1,590
download PDF
16
1,10
344
1,454
download PDF
17
864
1,040
1,904
download PDF
18
827
488
1,315
download PDF
19
1,182
556
1,738
download PDF
PH
2,322
download PDF
BUILDING AMENITIES
Elegant Entrance
Private Water front Property
High tech Fitness Center
Porte Cochere entrance & elegant boutique-style lobby
Resort style Pool
Cedar Sauna
Lush landscaping
Covered secure Parking garage with 24-hour surveillance
24- hour valet and assigned Parking
24-hour security
RESIDENCE FEATURES
Expansive floor-to-ceiling hurricane proof windows
9ft 4inch ceilings throughout
Designer fixtures & appliances with contemporary styling
European- Style Kitchen with elevated breakfast counter top
Fire protection sprinkler system & smoke detectors
Full- sized washer and dryer in every unit
High efficiency central air conditioning & heated system
Large Private balconies with breathtaking Water & City Views
Marble flooring in all bathrooms
Penthouses with private roof terraces & jacuzzi’s
Pre-wired for cable and High speed internet
• 10% Reservation – October 2012
• 10% with Contract – End of 2012 (est.)
• 20% at Ground Breaking – Summer 2013 (est.)
• 10% at Top off – Spring 2014 (est.)
• Completion – End 2014 (est.)